Wollar Substation – United Group Infrastructure

In 2009, MAAS Group were contracted to complete the bulk and detailed excavation along with stormwater and oil containment pipelines for the Wollar substation. This was a project conducted in a remote area with many challenges. MAAS Group successfully completed this project which consisted of over 80 pits, hundreds of metres of pipe and several kilometres of kerb.

MAAS also manufactured all the quarry products required for this project.